Product overview
Monitor conductivity, pH, free chlorine and turbidity in a shared sample stream for secondary water supply. Keep the chamber unpressurized. Select the configuration by checking all four sensor connections, including the turbidity probe diameter or thread.
Technical features
POM construction. Recommended sample flow is 300 to 500 mL/min.
Applications
Secondary water-supply monitoring.
Technical specifications and installation
| Parameter | NPT 3/4 and OD 30 Configuration | NPT 1/2 Configuration |
|---|---|---|
| Material | POM | |
| Conductivity sensor | Vertical graphite type with NPT 3/4 thread | Vertical graphite type with NPT 1/2 thread |
| pH sensor | NPT 3/4 thread | NPT 1/2 thread |
| Free-chlorine sensor | NPT 3/4 thread | NPT 1/2 thread |
| Turbidity sensor | 30 mm outside diameter | NPT 1/2 thread |
| Flow rate | 300 to 500 mL/min | |
| Working pressure | The internal chamber must not be pressurized | |
| Overall dimensions | 200 x 148 x 125 mm | 200 x 148 x 107 mm |
| Tubing | 1/4 in PE tube | |
| Total height with sensors | 265 mm + 65 mm drain-valve height | 247 mm + 65 mm drain-valve height |
| Application | Secondary water-supply monitoring | |
NPT 3/4 and OD 30 Configuration
Installation
1. Slide the retaining ring over the turbidity sensor, then install the O-ring below it. Compression of the O-ring secures the sensor to the flow cell. 2. Wrap PTFE sealing tape around the front NPT 3/4 threads of the other three sensors and install the sensors in the flow cell. 3. Wrap PTFE sealing tape around the three 1/4 in fittings and install them at the inlet, outlet and drain ports. 4. Connect the drain valve to the bottom of the flow cell with 1/4 in PE tube so accumulated solids can be discharged manually. 5. Fasten the flow cell to the mounting surface with M8 bolts. Flow direction: side inlet to side outlet; use the bottom valve for manual draining.
NPT 1/2 Configuration
Installation
1. Wrap PTFE sealing tape around the front NPT 1/2 threads of all four sensors and install the sensors in the flow cell. 2. Wrap PTFE sealing tape around the three 1/4 in fittings and install them at the inlet, outlet and drain ports. 3. Connect the drain valve to the bottom of the flow cell with 1/4 in PE tube so accumulated solids can be discharged manually. 4. Fasten the flow cell to the mounting surface with M8 bolts. Flow direction: side inlet to side outlet; use the bottom valve for manual draining.
Package contents
Quantities are per kit. Read the column for your ordered configuration.
| Included Item | NPT 3/4 + OD 30 mm | NPT 1/2 |
|---|---|---|
| YEX-ACC-CELL-RN flow cell body | 1 pc | 1 pc |
| Straight quick fitting, 1/4 in male to 1/4 in quick-connect | 3 pcs | 3 pcs |
| Elbow quick fitting, 1/4 in male to 1/4 in quick-connect | 1 pc | 1 pc |
| Water-purifier tube, 1/4 in | 2 m | 2 m |
| Quick-connect ball valve, 1/4 in | 1 pc | 1 pc |
| Plastic plug | 3/4 in · 3 pcs | 1/2 in · 4 pcs |
Maintenance
Isolate the sample line and release pressure before opening the chamber. Clean with water and a test-tube brush. Inspect the seals and fittings, then check for leaks as flow resumes.
Request a quotation
Send the sensor models, mounting threads, sample flow and required quantity to sales@yexsensor.com.
Frequently asked questions
Can the chamber be pressurized?